Plumbing and electrical.
Today the guys spent a lot of the morning cutting and
attaching a lot of little boards to the walls to even
them out. That was a lot of work, but it doesn’t look
that impressive in the photos. Then they replaced the
window and did all the plumbing and electrical work by
the end of the day.
There’s a little drama right now. Our tub was
supposed to be in Monday, and it’s still not here.
Um, they need it. I’m hoping it will come out
Thursday, and I’ll find out in the morning. Tomorrow
is sheetrock, and hopefully installation of the tub if
it comes in. Keep your fingers crossed.






